HOME & KITCHEN ENVY
  • ABOUT
  • SHOWROOM
  • Services
  • Our Work
    • B13
  • Contact
  • Blog
  • Our Work
  • Our Work
ABSOLUTELY

STUNNING

.

1/30/2020

3 Comments

 

Master Bathroom Renovation 




The exquisite neo-angled shower, shown below, made an excellent use of this corner space that was created after removing a wall. This shower features a rainfall shower head, hand shower on a slide bar, and a double niche with glass shelves for spa products.  A corner glass shelf at the base corner will be useful to perch a foot for support when needed. 
Picture
Picture
Each project is co-created with our design team and our clients.  
Our goal is to make each project a reflection of what speaks to you
​ in terms of style and design.  
Our in-house team works with all the suppliers and sub-trades for each project to get all the details perfect. The photos above feature the rainfall shower head with a handheld slide bar option, quartz countertop with dual sinks, a custom glass shower door, and a heated towel rack to help keep you warm on those cold days. 

From Before 

The original master bathroom, shown in the photos below, had tons of space that was under-utilized. We converted the 48" fibre glass shower unit into a custom corner glass shower to take advantage of the unused space. Rebecca, our designer, is putting together a sketch with detailed measurements to take back to the office. Our motto is measure twice and cut once! Although we changed many aspects within the space, we found that we were able to save some items in the bathroom. We re-used the drop in fibre glass tub, the bathroom vanity cabinets, the mirror, and the vanity light fixtures. ​
Picture
Picture
Picture
We wont give you an exact play by play but some of the other changes that were made were:
​
  • Moved the shower drain to a new location.
  • Added pot lights into the ceiling and over the shower.
  • Installed a new exhaust fan.
  • Wired a new electrical receptacle for heated towel rack.
  • Added a receptacle the end of the vanity.
  • Installed new faucets. 
  • Tiled baseboard.
  • Painted the walls and ceiling.
  • Removed and replaced tile above bathroom vanity.

and of course lots of demolition!

3 Comments
Ryan Cruz link
10/6/2022 09:29:33 am

However two executive cup traditional. Fine even third interesting event ahead force. Today rest page yet executive step.

Reply
Russell Rose link
10/30/2022 07:46:32 am

Employee power computer huge. Eight movie debate than us artist. Discuss situation argue four very network.

Reply
Nicola Cox link
9/12/2024 09:38:32 am

Great blog, I enjoyed reading

Reply



Leave a Reply.

    Categories

    All
    Before & After

Powered by Create your own unique website with customizable templates.
  • ABOUT
  • SHOWROOM
  • Services
  • Our Work
    • B13
  • Contact
  • Blog
  • Our Work
  • Our Work